Skip to main content

Contact Sign Services Plus

Get a sign permit started today

Fill in the sign permit application form and you will have a written assessment — what the jurisdiction allows, what it costs, how long it takes — within one business day. No charge, and no obligation to proceed.

  • Call: (773) 232-5878 — ask for a permit specialist.
  • Email: info@signservicesplus.com
  • Office: 241 S Frontage Road, Suite 42, Burr Ridge, IL 60527
  • Hours: Monday to Friday, 8:00 AM – 6:00 PM Central

Already have a permit with us? Check its status any time on the permit tracker.

1 dayAssessment turnaround
50+States and D.C.
$0Cost to ask us
  • No obligation
  • White-label
  • Fees up front
  • Named specialist
SIGN AREA HEIGHT

Sign Permit Request Form

Send us the address and sign type. You get scope, cost and timeline back within one business day.

Fast sign permit approval starts with good inputs

What to send, and what we do with it

You do not need all of this. The first two items are enough to get a useful answer.

The full street address

This is the single most important input. The address determines the jurisdiction, the zoning district, any overlay, and whether a state highway or historic designation is in play.

The sign type and size

Channel letters, cabinet, monument, pylon, awning, window vinyl, electronic message center — and rough dimensions if you have them. A photo of the storefront helps more than you would think.

Artwork or elevations, if they exist

Even a rough sketch. We check proposed sign area against the local allowance before anything gets fabricated, which is where most rejections are avoided.

Landlord or tenant sign criteria

If the property has a sign criteria document or a lease exhibit covering signage, send it. Many jurisdictions require written landlord consent, and criteria are often stricter than the code.

Your target install date

Tells us whether the normal path works or whether we need to look at expedited review, phased permitting or a temporary sign in the interim.

Contractor and licensing details

Who is installing, and whether they hold the licenses that municipality requires. Some jurisdictions will not accept an application without a locally licensed sign contractor named on it.

What happens next

From your form submission to a filed application

Within one business day

A permit specialist reviews your address, identifies the reviewing authority and comes back with an initial read on feasibility, fees and timeline.

You approve the scope

Jurisdiction fees and our flat service fee are quoted separately and in writing. Nothing is filed and nothing is billed until you say go.

We prepare and file

Package assembled, drawings checked against the code, landlord approvals and licensing gathered, then submitted the way that office requires.

We follow it through

Plan review comments answered, resubmittals handled, status visible on the tracker, and the approved permit sent to you with any inspection requirements spelled out.

Sign permit form questions

Before you fill it in

Is the assessment really free?

Yes. Identifying the jurisdiction and giving you a realistic read on feasibility, fees and timeline costs you nothing and carries no obligation. We would rather tell you honestly that a sign is a hard permit than take on a file that was going to disappoint you.

How fast can you get a permit approved?

Our part moves in days; the jurisdiction’s part is theirs to control. What we influence is the number of review cycles, and filing a complete, code-compliant package first time is the difference between two weeks and two months. Where a jurisdiction offers expedited or over-the-counter review, we will tell you whether your project qualifies.

Do you need a signed contract before you start?

For the free assessment, no — just the address. Before we file anything we will have a written scope and fee approval from you, because municipal fees are non-refundable once paid.

What if I only need one permit?

That is fine. Single permits are welcome and priced the same flat way. Plenty of long-term clients started with one difficult jurisdiction they did not want to learn.

Stop losing install dates to permit delays

Send us the address and the sign drawing. We confirm what the jurisdiction requires, what it costs and how long it takes — then we file it, chase it and hand you the approved permit.